The Authority SuiteRuck AuthorityKit AuthorityAperture AuthoritySprout AuthorityDrone AuthorityHouse Pet Authority
Compare two to four resources

Compare textile resources.

Review access, scope, source evidence, and limitations side by side before choosing what to inspect next.

Selected resources

3 resources selected.

Swipe the table sideways to inspect all 3 routes

Side-by-side evidence and decision metadata for selected textile resources.
Decision fieldOpen accessYarnSubGlobalRemoveOpen accessPattern Grader Hiring BriefGlobalRemoveOpen accessCPSC Certificate eFilingUnited States · North AmericaRemove
Decision fit
Primary jobChoose materialsFind patterns & fitCheck standards
AreaYarnPatterns & fitStandards
Best forReplacing a discontinued or unavailable yarnScoping and accepting freelance pattern-grading workPlanning the current CPSC certificate-data handoff for regulated imports with the importer, finished-product certifier, customs broker, and entry records
Know before usingA suggested match is a data-based shortlist, not proof that the yarn suits the pattern or maker. Yarn records can be incomplete or wrong, prices and availability vary by market, and the site uses affiliate links. Confirm the required gauge, total length, fibre behavior, construction, care, color, dye lot, accessibility, and seller terms, then make and assess a representative swatch before committing.The brief does not approve a base pattern, size system, grade rule, pattern, file, provider, contract, classification, fee, fit, sample plan, production use, or intellectual-property position, and it does not replace qualified pattern, fit, CAD, employment, tax, privacy, and legal review.The portal does not decide whether a product requires certification, identify the correct rules or certificate data, classify an entry, replace the current 16 CFR part 1110 text, or reconcile a filing to an actual shipment. Effective dates and workflows differ by entry route; use current CPSC, CBP, customs, product-safety, and legal review.
Practical access
ForMakersApparel brandsApparel brands
Location or jurisdictionGlobalGlobalUnited States · North America
AccessOpen accessOpen accessOpen access
FormatReferenceStitch AuthorityReference
Source typeFirst-party platformStitch AuthorityGovernment guidance
Source and review
What the source establishesYarnSub's official FAQ says its matching software compares gauge, texture, yarn weight and density, fibre content, and fibre qualities such as drape and softness. Discontinued yarns remain searchable as starting points but are excluded from suggested replacements, and each yarn page provides a route to report source-data problems.The source-reviewed brief cites current U.S. Department of Labor task and title evidence, ISO documented-information, size-designation, body-table, and garment-measurement sources, first-party CAD exchange guidance, and one professional discovery route; it requires controlled inputs, explicit authority, receiver-tested files, sewn evidence, and acceptance records.CPSC operates the eFiling portal with role-specific importer, broker, applicability, Product Registry, regulated-product, laboratory, ACE, FAQ, video, and document-library routes. The certificate final rule took effect July 8, 2026 for covered non-FTZ products, with separate timing for covered FTZ entries.
Linked page reviewedJul 21, 2026Jul 16, 2026Jul 16, 2026
Next review dueJan 17, 2027Jul 16, 2027Oct 14, 2026
Inspect
How to compare

Use the rows to narrow your next check.

  1. Choose resources that could solve the same job.
  2. Eliminate access, scope, or jurisdiction mismatches.
  3. Read each limitation before following the source.
  4. Verify project-specific claims with the source or provider.