The Authority SuiteRuck AuthorityKit AuthorityAperture AuthoritySprout AuthorityDrone AuthorityHouse Pet Authority
Compare two to four resources

Compare textile resources.

Review access, scope, source evidence, and limitations side by side before choosing what to inspect next.

Selected resources

4 resources selected.

Swipe the table sideways to inspect all 4 routes

Side-by-side evidence and decision metadata for selected textile resources.
Decision fieldOpen accessControlled Tech Pack OrientationGlobalRemoveOpen accessYarnSubGlobalRemoveFree downloadSeamly2DGlobalRemoveOpen accessHook & Needle Diameter ReferenceGlobalRemove
Decision fit
Primary jobSource productionChoose materialsFind patterns & fitLearn techniques
AreaProductionYarnPatterns & fitYarn
Best forUnderstanding what a tech pack must control before using a template or releasing workReplacing a discontinued or unavailable yarnDigital pattern draftingChecking which U.S. alias the current Craft Yarn Council table gives a known metric package size before confirming project gauge
Know before usingAn orientation rather than a completed product record; it does not supply a universal format, licensed standard content, measurements, tolerances, construction settings, labels, approvals, compliance conclusion, or product-release authority.A suggested match is a data-based shortlist, not proof that the yarn suits the pattern or maker. Yarn records can be incomplete or wrong, prices and availability vary by market, and the site uses affiliate links. Confirm the required gauge, total length, fibre behavior, construction, care, color, dye lot, accessibility, and seller terms, then make and assess a representative swatch before committing.Patternmaking knowledge, controlled measurement files, production conventions, and sewn fit testing are still required. The software does not validate body measurements, ease, balance, grading rules, fabric behavior, construction, or product fit. The project currently labels its user wiki manual as needing updates, so confirm current commands and file behavior against the installed release and active support channels.The reference is not a dimensional measurement, manufacturer inspection, UK or Canadian conversion, steel-hook chart, tool recommendation, yarn assignment, gauge result, or proof that a proposed tool will produce the required fabric.
Practical access
ForApparel brandsMakersBothMakers
Location or jurisdictionGlobalGlobalGlobalGlobal
AccessOpen accessOpen accessFree downloadOpen access
FormatStitch AuthorityReferenceSoftwareStitch Authority
Source typeStitch AuthorityFirst-party platformOpen-source projectStitch Authority
Source and review
What the source establishesThe guide cites current ISO sources for documented-information, garment-measurement, stitch, and seam boundaries plus current U.S. FTC textile and care-labeling guidance; it explicitly separates those authorities from product-specific technical and market decisions.YarnSub's official FAQ says its matching software compares gauge, texture, yarn weight and density, fibre content, and fibre qualities such as drape and softness. Discontinued yarns remain searchable as starting points but are excluded from suggested replacements, and each yarn page provides a route to report source-data problems.The maintained Seamly2D repository identifies the application as GPLv3+ open-source patternmaking software for Windows, macOS, and Linux. It reads multi-size measurement files for standardized sizes and individual measurement files for custom-fit work, publishes downloadable builds and releases, and links an active website and user forum.The lookup reproduces the current public Craft Yarn Council metric and U.S. alias rows and follows the Council's warning that company letter and number labels vary; blank aliases remain blank instead of being inferred.
Linked page reviewedJul 16, 2026Jul 21, 2026Jul 21, 2026Jul 16, 2026
Next review dueJul 16, 2027Jan 17, 2027Jan 17, 2027Jul 16, 2027
Inspect
How to compare

Use the rows to narrow your next check.

  1. Choose resources that could solve the same job.
  2. Eliminate access, scope, or jurisdiction mismatches.
  3. Read each limitation before following the source.
  4. Verify project-specific claims with the source or provider.