The Authority SuiteRuck AuthorityKit AuthorityAperture AuthoritySprout AuthorityDrone AuthorityHouse Pet Authority
Compare two to four resources

Compare textile resources.

Review access, scope, source evidence, and limitations side by side before choosing what to inspect next.

Selected resources

4 resources selected.

Swipe the table sideways to inspect all 4 routes

Side-by-side evidence and decision metadata for selected textile resources.
Decision fieldOpen accessApparel Grade-Rule & Size-Run Validation RecordGlobalRemoveOpen accessFabric Mass Unit ConverterGlobalRemoveOpen accessYarnSubGlobalRemoveFree + paidMaker’s RowUnited States · North AmericaRemove
Decision fit
Primary jobFind patterns & fitChoose materialsChoose materialsSource production
AreaPatterns & fitMaterialsYarnProduction
Best forAuditing inherited grade rules or controlling a new multi-size pattern release from approved targets through sample evidenceTranslating the same fabric mass-per-area result between metric and U.S. customary listingsReplacing a discontinued or unavailable yarnFinding US production partners
Know before usingThe record does not create a production grade, supply universal increments or breakpoints, validate a CAD file or fit population, reproduce licensed standards, or replace qualified anthropometric, pattern, technical-design, fit, quality, accessibility, safety, statistical, and user-research review.The result is a numerical unit conversion, not a new measurement or conformance decision; it does not establish sample or lot representativeness, significant digits, drape, warmth, opacity, thickness, stretch, strength, shrinkage, durability, sewability, end use, target, or tolerance.A suggested match is a data-based shortlist, not proof that the yarn suits the pattern or maker. Yarn records can be incomplete or wrong, prices and availability vary by market, and the site uses affiliate links. Confirm the required gauge, total length, fibre behavior, construction, care, color, dye lot, accessibility, and seller terms, then make and assess a representative swatch before committing.A factory profile, platform label, bid, estimate, or message does not establish current identity, factory ownership, capability, capacity, workmanship, pricing, compliance, delivery, or project fit. Paid-plan visibility can affect who responds. Verify the production site, subcontracting, references, samples, quality and compliance records, specifications, commercial terms, and remedies directly.
Practical access
ForApparel brandsBothMakersApparel brands
Location or jurisdictionGlobalGlobalGlobalUnited States · North America
AccessOpen accessOpen accessOpen accessFree + paid
FormatStitch AuthorityStitch AuthorityReferenceMarketplace
Source typeStitch AuthorityStitch AuthorityFirst-party platformCommercial marketplace
Source and review
What the source establishesThe guide cites current ISO body-table, size-designation, and garment-measurement boundaries plus two peer-reviewed studies that tested the relationship between conventional grade rules, anthropometric evidence, and garment fit; it requires product-specific target deltas and validation instead of publishing universal increments.The calculator uses the NIST SP 811 Appendix B.8 conversion from avoirdupois ounces per square yard to kilograms per square metre and links to a source-reviewed fabric mass record for method, sampling, conditioning, and product controls.YarnSub's official FAQ says its matching software compares gauge, texture, yarn weight and density, fibre content, and fibre qualities such as drape and softness. Discontinued yarns remain searchable as starting points but are excluded from suggested replacements, and each yarn page provides a route to report source-data problems.Maker's Row currently lets a brand submit a project before advance sign-up, then provides access to an account. Its project workflow records product details and files and connects projects with factories by location and specialty. Search guidance lists apparel capabilities such as pattern making, sourcing, sample making, and production. Factory access to bids is plan-dependent.
Linked page reviewedJul 16, 2026Jul 16, 2026Jul 21, 2026Jul 21, 2026
Next review dueJul 16, 2027Jul 16, 2027Jan 17, 2027Jan 17, 2027
Inspect
How to compare

Use the rows to narrow your next check.

  1. Choose resources that could solve the same job.
  2. Eliminate access, scope, or jurisdiction mismatches.
  3. Read each limitation before following the source.
  4. Verify project-specific claims with the source or provider.